Know More

This company entered the second phase of the project in 2017 with the development of the airport and installing the longest moving walks in Iran. These Moving walks were built with unique technology and installed by the technical team of this company due to the limited space in the pit.

The connection bridge between phase 1 and 2 was put into operation in 2014. 4 moving walks were installed in this bridge, which brought the total of moving walks to 365 meters.

Currently, all elevators and escalators of Imam Khomeini Airport with 39 elevators, 29 escalators and 9 moving walk are operated and maintained by Tamkin Foulad Asanbar.